
Наш случай
Nigeria Refinery Project
- Категория: Наш случай
- Автор:
- Источник:
- Время публикации: 2020-03-10
- Посещаемость:4
[Краткое описание]
Nigeria Refinery Project
[Краткое описание]
- Категория: Наш случай
- Автор:
- Источник:
- Время публикации: 2020-03-10 10:15
- Посещаемость:4
Client: Onshore Construction (India)
Project: Nigeria Refinery Project
Time: In Year 2015
Location: Nigeria
Workshop Size: 120m L x 30m W
Designed productivity: 2,000DI/shift(8 hours); 500,000DI/year (250 Working Days)
System Highlights:
By helping our clients design and plan the whole fabrication workshop, we can enhance their ability to undertake and operate projects.
Man. hour/DI: 0.216(Manpower needed: 54 operators, including 21 helpers).
Suitable for CS, SS, ALS, Duplex SS and other materials, covering from 2” to 48” diameter range.
Suitable for raw material length range from 4m to 12m, spool length up to 12m.
Для просмотра сканируйте QR-код с помощью мобильного телефона
Адрес: B4 11th Floor, Jiulonghu International Headquarter Park, NO.19 Suyuan Avenue, Jiangning District, Nanjing, China.
Электронная почта:auto@autowelds.com

Micro письмо






